Time:[2016-6-15]  Hits:4737

Followed by the State to vigorously promote Prefabricated construction today, Foshan steel construction and more subject to our attention. The following are some of Foshan Steel watch point plan for us to see.
A Frame
⑴ portal frame should first determine whether there is a crane, such as plant demand resettlement process requests crane, you should note the following: ① column foot should be planned into a rigid column base; ② column should be planned into uniform section column; ③ between support columns by longitudinal horizontal crane load control programs, rather than a simple construction planning, when there are no less than 5 t crane when, should use steel support. As no crane portal frame, press columns and other practices planning a wedge, not repeat them.
Room ⑵ column support resettlement
Between the columns support the roof support pillar should be placed in the same room, so that the formation of a stable system of longitudinal frame, frame means to facilitate and increase the longitudinal stiffness. Support should be placed between the top of the second column by column from time to time, when placed in the second inter-column list when the appropriate placement of a rigid column tied, and the rigid tie rod and the wind column longitudinal orientation together, make a direct transfer wind loads. The turning point in the frame (single-span roof of the house and column capitals and some centers and multi-span pole in the house and the roof) should be set rigid Tied houses along the entire length. When larger span gantry in place between support columns should be appropriate to increase the number of rigid tie rods that support the angle is about 45 °. When the construction of functional constraint that can not be disposed between the support column, should be placed longitudinal frame. And that they've done this to make a rigid connection between the end of the column beams, studs and then cancel the support of engineering, construction make placement more flexible, with good results.
⑶ roof and wall construction
Roof and wall construction approach is to increase the stiffness of the frame, the key way to avoid the outer frame plane instability. Purlins, wall beams generally composed of cold-formed thin-walled structures formed when the column spacing less than 6 m, when designing a brace, more than 6 m, located two brace. Here should be mentioned especially the oblique bars, school diagram process, we often see a lot of steel structure manufacturers or planners provided the oblique strut bar without setting conditions. Factor is the construction concept is not very clear, because after construction mechanics, disposed between the oblique strut bar, before the formation of a stable system. In the roof, walls planned resettlement should also be noted bracing, bracing is not a luxury it is to avoid perverting the compression flange provided. Studies have shown the first portal frame damage due to pressure caused by perverting the largest flange. Oblique inner flange beams converge at the column flange and frame is the emergence of perverting vital parts, there is provided bracing is very important. In addition, the "portal frame light house steel construction technical specification" CECS102: 2002 (hereinafter referred to as CECS102: 2002) rules: oblique beams in the bottom flange of the compression zone is also set bracing, a distance not greater than the corresponding compression wing edge width of 16 (235 / fy) 0.5 times. When you press a general portal frame, purlin distance of about 1500 mm, a spacer is provided a bracing purlins above conditions can be satisfied.
⑷ shear key
"CECS102: 2002" rules: column anchor should not be used to withstand the horizontal shear column foot portion, the horizontal shear force by friction between the floor and the concrete foundation (friction coefficient desirable 0.4) or set shear joints bear. This is the time of our accounting mast, usually displayed warning: "Let Shear pedestal demand!"
Analysis of these factors, the main door is made generally lighter weight structure, column friction soles of the feet and between the concrete foundation is small enough to resist lateral wind loads and seismic effects, it should set the shear key. Usually the shear key beam with angle iron or steel, the shear bearing capacity of the cross section of the weld should be accounted for, columns and soles of the feet of open space between the surface of the foundation secondary grouting. Specifically refer to "many high-rise residential construction steel structure node configuration detail" 01SG519 diagram on page 30 to gather a large sample 1,2 practices.
Means for positioning the column anchor ⑸
This is the planners generally ignores questions and anchors positioned in engineering practice inaccuracy or rigid frame construction of the device difficult project case everywhere, we also encountered such a situation, and later had to reinforcement. Analysis of factors, notably the non-convergence between the anchors, the overall stiffness of the poor in the process of pouring concrete in the anchor inevitably shift. In response to these factors, taken before pouring concrete column anchor embedded fixation process, the specific approach shown in Figure 1. Mounting bracket and bolt to form a small lattice columns, positioned so the anchor would facilitate accurate. ⑹ wind columns and frame the current convergence of wind portal frame column planning practice there are two mistakes: one is the wind column and frame made of the same wind columns and beams or hinged frame or just then, the wind column to both wind and participate vertical load effect and the effect of the horizontal level. The planners do not usually do such a frame of longitudinal wind checking. This is done omissions load, Project Planning is a taboo. I think you are a force bent structure that clearly should not complicate it by force. This approach is defective; Another approach is to wind column and frame on one axis, but do not think that wind column vertical load effects wind between columns and beams with a steel frame after welding joints connected. This practice is still a part of the vertical load transmitted to the column of wind, and the steel sheet is small lateral stiffness, vertical load at the onset of the effect is difficult to ensure that there is barely after the land transfer the wind load. These two approaches have disadvantages. Here we recommend the following practices:
Plant selection do legal grids, Pin top frame column axis wind shifted 500 ~ 600 mm, wind through the column flange adapter plate is connected to the frame beam stiffeners and plate convergence and vertical stiffener open a long hole, use an ordinary bolt adapter bolts approach shown in Figure 2. Figure 2 wind column and frame adapter bulk sample
Plan 2 steel structure
Select ⑴ steel building systems
Common constructions of steel construction system can be divided into pure and construction - support systems into two categories. Highly selective and construction material systems, the use of closely-related features. This requires the construction engineer should work closely with the architect, when the construction of functional constraint can not be set because the support system should be used pure structure. Pure system configuration because no anti-sway support, two vertical and horizontal directions to satisfaction, "the construction of earthquake planning standards" GB50011-2001 (hereinafter referred to as "anti-regulation") Section 5.5 of the elastic layer between the displacement angle less than or equal request 1/300, beam the column in vertical and horizontal directions should just pick; because of "anti-regulation" section 8. 3.4 rule: "when the column in two mutually perpendicular directions and beam rigid connection, should use box-section" Therefore, use of pure construction system, usually planning to box column column column inside the box but the process of applying rust and proper maintenance difficult, which is steel construction planning a major problem. They are also trying to choose the column method of pouring concrete in the plan, but because the box column separator disposed stiffening node area, pouring concrete very difficult; on the other hand, the country is still in the concrete pipe during the discussion, common planning software can not be accounted for accounting theory in the Journal of the different. Based on the above factors when planning constructions of pure steel, most still use non - concrete box section column. Own labor process selected word column strong and weak axes are rigid convergence algorithm, according to the "anti-regulation" section of Article 8.3.4 of the text is selected, "should", see also the mainland large selection of drawings and Planning Institute said planning in spreadsheets method, but calculation results are not satisfactory, the elastic layer between the weak axis direction displacement angle is still unable to meet the request, "anti-regulation" of Article 8. 3.4. Because the box column in the structure of some tough, so the idea when planning a multi-layer steel cylinder-shaped house built try to use planning to construct - support system. Construction engineers and construction division to coordinate as much as possible, through resettlement in demand resettlement support bearing floor, elevator, which do not open big hole in the wall to achieve the support of stealth. The results indicate the accounting practice engineering, construction support displacement control effect is very good, so that in addition to the choice of column-shaped material saving, anti-rust, the use of easy maintenance, easy convergence weak axis direction, it is a useful method.
⑵ node Planning
Steel structure node planning is the key to planning steel structure. Hinged nodes simple, clear contact mechanics, where not too much to say, just focus on what connected node planning. Moment resistant convergence plan, "anti-regulation" 8 3.4 Recommended use Standard Figure 8. 3.4 - The node 1 in the form, in engineering practice are mostly chosen is such a node. This node has two accounts in accordance with: accurate programming and general programming. The difference between the two is that the former Reflections bending and shear webs, the latter only ponder web shear. Accurate planning law planning in practice, difficult bending webs satisfied request must be thickened to a large extent the web. The approach is very thick web of economic, so most use common project planning method, this accounting model Mechanics clear, simple accounting, but must pay attention to planning to take measures to strengthen the earthquake, such as the use of the plastic hinge relocation enhanced convergence or end of the beam away from the beam ends not far from the upper and lower flange beams weaken dog bone convergence. This is because, in the end without any reinforcing beam flange case, only ponder web convergence shear bolts bear, bear moment by the flange weld, then weld flange flexural capacity of only about 80% capacity BEAMS (that is, only beams with the section modulus of the beam flange section modulus of about 80%), then press the "steel construction planning standards" on page 3. 2.2, thinking construction site conditions weld strength reduction factor 0 is multiplied by the value of planning. 9, then the flexural capacity of the beam flexural capacity of Cohesion only 70% to 75%. This strong convergence node ratio is even lower 30% to 25%, in violation of the "earthquake not fall," the basic principles of earthquake "strong nodes, weak bars." Based on the above factors, it should be used "many high-rise residential construction steel structure node configuration detail" earthquake shown on page 19, 20 01SG519 portfolio strengthened approach.
Else
In our "anti-regulation" and "the Rules" the rules were not steel structure seismic level, just 12 minutes and 12 layers or less standard and two or more layers. I thought it was relative to our vast big difference around the fortification is characterized by inappropriate. Old "the Rules" in the multi-set size of a house built high-rise steel expansion joints no rules, only single industrial plant made some rules. These two points are the conceptual big question, "the Rules" does not emphasize these two points is appropriate.
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
国产精品1024永久免费视频 | 日日日夜夜操| 色综合久久久久综合体桃花网| 日韩av成人| 尤物视频网站在线观看| 亚洲第一页乱| 欧美另类videosbestsex视频| 成人在免费观看视频国产| 日韩中文字幕一区二区不卡| 精品久久久久久免费影院| 国产伦理精品| 国产视频久久久久| 久久99爰这里有精品国产| 台湾毛片| 欧美另类videosbestsex视频| 欧美大片毛片aaa免费看| 二级片在线观看| 在线观看导航| 欧美激情一区二区三区视频| 免费一级片网站| 国产美女在线观看| 久久99中文字幕| 国产麻豆精品| 免费国产在线观看| 日本免费乱理伦片在线观看2018| 国产成人啪精品视频免费软件| 欧美18性精品| 欧美激情在线精品video| 久久久成人网| 97视频免费在线观看| 国产一区二区精品久久91| 国产一级强片在线观看| 成人av在线播放| 久久国产精品只做精品| 亚洲 男人 天堂| 国产伦理精品| 亚洲天堂在线播放| 日日夜人人澡人人澡人人看免| 青青青草视频在线观看| 亚洲www美色| 欧美激情一区二区三区在线播放| 精品久久久久久免费影院| 国产不卡精品一区二区三区| 精品视频免费在线| 欧美激情一区二区三区视频| 日本伦理黄色大片在线观看网站| 欧美激情在线精品video| 国产成人精品一区二区视频| a级毛片免费全部播放| 一本伊大人香蕉高清在线观看| 欧美激情中文字幕一区二区| 91麻豆国产| 精品国产一区二区三区久久久蜜臀| a级精品九九九大片免费看| 麻豆午夜视频| 亚洲精品影院一区二区| 可以免费看污视频的网站| 麻豆午夜视频| 成人免费网站视频ww| 日韩女人做爰大片| 九九九国产| 国产国产人免费视频成69堂| 天天色色色| 日韩一级黄色| 99久久精品国产国产毛片| 日韩免费片| 欧美夜夜骑 青草视频在线观看完整版 久久精品99无色码中文字幕 欧美日韩一区二区在线观看视频 欧美中文字幕在线视频 www.99精品 香蕉视频久久 | 美女被草网站| 欧美激情一区二区三区在线| 国产一区二区精品久久| 四虎影视库国产精品一区| 日本伦理网站| 精品视频在线看 | 欧美另类videosbestsex久久| 九九精品影院| 免费一级片在线观看| 国产极品精频在线观看| 好男人天堂网 久久精品国产这里是免费 国产精品成人一区二区 男人天堂网2021 男人的天堂在线观看 丁香六月综合激情 | 精品视频免费观看| 国产91视频网| 日本特黄特色aaa大片免费| 91麻豆精品国产自产在线观看一区| 99久久精品国产国产毛片| 好男人天堂网 久久精品国产这里是免费 国产精品成人一区二区 男人天堂网2021 男人的天堂在线观看 丁香六月综合激情 | 国产福利免费视频| 一级毛片视频在线观看| a级黄色毛片免费播放视频| 亚洲 男人 天堂| 精品毛片视频| 国产伦久视频免费观看 视频 | 日本免费看视频| 麻豆系列 在线视频| 久久国产精品永久免费网站| 日本特黄特色aa大片免费| 九九国产| 久久精品店| 黄视频网站在线看| 久久精品免视看国产成人2021| 精品在线视频播放| 中文字幕97| 日韩字幕在线| 国产一区精品| 美女免费黄网站| 久久精品免视看国产明星| 日韩字幕在线| 日韩免费在线视频| 二级特黄绝大片免费视频大片| 99色吧| 一a一级片| 日韩免费片| 精品视频免费在线| a级黄色毛片免费播放视频| 欧美日本免费| 香蕉视频亚洲一级| 日韩中文字幕一区二区不卡| 色综合久久天天综合| 欧美激情中文字幕一区二区| 九九久久99| 国产91精品一区二区| 日本特黄特色aa大片免费| 日本免费区| 黄视频网站在线看| 午夜激情视频在线播放| 一a一级片| 国产不卡高清在线观看视频| 精品视频在线观看视频免费视频| 欧美大片aaaa一级毛片| 欧美激情一区二区三区在线播放| 香蕉视频亚洲一级| 国产网站免费| 青青久久精品| 欧美国产日韩在线| 成人免费一级毛片在线播放视频| 精品久久久久久综合网| 日韩av东京社区男人的天堂| 免费毛片播放| 午夜精品国产自在现线拍| 国产激情视频在线观看| 日韩在线观看视频免费| 久草免费在线色站| 中文字幕Aⅴ资源网| 欧美a级成人淫片免费看| 日韩中文字幕在线播放| 久久福利影视| 欧美激情在线精品video| 国产不卡在线播放| 黄视频网站在线免费观看| 精品美女| 色综合久久手机在线| 日韩中文字幕在线亚洲一区| 99热热久久| 一级女性全黄久久生活片| 精品久久久久久中文字幕2017| 免费一级片在线观看| 午夜欧美福利| 青青青草影院| 国产成人精品在线| 日本伦理黄色大片在线观看网站| 精品国产一区二区三区久久久狼| 欧美18性精品| 国产麻豆精品视频| 午夜欧美成人久久久久久| 成人在免费观看视频国产| 日本伦理片网站| 亚洲天堂在线播放| 国产精品1024永久免费视频| 久久99青青久久99久久| 久久久成人网| 韩国三级视频在线观看| 日韩免费在线观看视频| 国产伦理精品| 香蕉视频亚洲一级| 亚洲女人国产香蕉久久精品| 欧美夜夜骑 青草视频在线观看完整版 久久精品99无色码中文字幕 欧美日韩一区二区在线观看视频 欧美中文字幕在线视频 www.99精品 香蕉视频久久 | 成人免费一级毛片在线播放视频| 久久国产精品永久免费网站| 九九九国产| 青草国产在线观看| 国产a视频| 精品在线免费播放| 国产91精品系列在线观看| 国产伦精品一区二区三区无广告| 成人免费网站久久久| 欧美激情一区二区三区视频| 国产一区二区精品久久91| 国产高清在线精品一区a| 黄视频网站在线观看| 毛片高清| 美女免费精品视频在线观看| 欧美激情在线精品video| 99热精品一区| 日韩专区亚洲综合久久| 天天做人人爱夜夜爽2020毛片| 国产伦久视频免费观看 视频 | 精品国产三级a∨在线观看| 天天做人人爱夜夜爽2020毛片| 国产不卡在线观看| 九九久久99| 国产国语对白一级毛片| 国产一区二区高清视频|