国产久操视频-国产久草视频-国产久热精品-国产久热香蕉在线观看-青青青青娱乐-青青青青在线成人视99

Language:CHINESESENGLISH

Home > News > Construction measures of Foshan steel structure during rainy season
CONTACT US
  • Address:Pingtang Industrial District, Shipeng Village, Shishan Town, Nanhai District, Foshan City,
  • Phone:0757-81002668/0757-63323396
  • Fax:0757-81196682
  • Contact:Ben Zheng/13826981293 Kerry Lu/13751224830
  • E-mail:sbs@sbsprefabhouse.com
  • URL:http://www.xseuw.cn

Construction measures of Foshan steel structure during rainy season

Time:[2017-9-27]  Hits:4647

First, Foshan steel structure project rainproof measures
Arrange special people to know the weather forecast in time and master the weather data in advance. Arrange the inspection management of special site in rain, do not comply with the rainproof measures or measures non-standard place, must subcontract deadline ordered rectification, especially for lightning protection measures must be carefully check all.
Two, Foshan steel formwork rainproof measures
When the formwork is stacked, the lower layer must be ground with the ground to prevent the rain from soaking and damaging. At the template stacking site, effective ground drainage measures must be taken to prevent rainwater from depositing.
Three. Rainproof measures for reinforcing bars
L for the site to place a longer time to prevent rain reinforcement steel cover, prevent serious corrosion of reinforcement. The steel stacking site must have good drainage to prevent rainwater from depositing and soaking the corroded reinforcement.
2 Foshan steel structure rainproof measures
To ensure the normal construction period, ensure the quality of the project. The main process of the project and the climate sensitive process, should be based on the characteristics of the rainy season construction, the preparation of the corresponding measures.
High strength bolts shall not be installed on rainy days, and no rain water shall be allowed on friction surfaces and high-strength bolts. During rainy weather, can not meet the requirement of production and can not guarantee the safety of construction, should stop construction. At this point, attention should be paid to ensure the safety of the work surface, set up the necessary temporary reinforcement measures. Steel structure hoisting must hang net in the outside of the building facade, building stairs, building adjacent edges and can not cover the holes to set up protective railing. For the components to be lifted, the water on the surface of the component shall be cleaned first, especially the friction surface of the component, and the surface layer shall be dried
3 、 welding of Foshan steel structure
Before the construction, should be in the operating platform than at the height of 1m welding with flame retardant woven cloth is tightly wrapped around the pillar, and the platform plane caves with asbestos clothgai Yan, so that the wind and the welding slag splashing down. In principle, outdoor welding is not performed on rainy days. Welding machine, welding wire, the cylinders should be placed in a special shed. So as not to damp the welding material.
4. Installation of high strength bolts for steel structure in Foshan
The use of high-strength bolt, high strength bolt with visual inspection, there shall be no rust, damage thread phenomenon, such as repair after use. Keep the connection clean and dry.
5, Foshan steel structure scaffolding rainproof measures
Rain, rain must be checked one by one to the scaffold fastener, and must check the scaffolding foundation is firmly in the inspection process. In the inspection process, construction and inspection personnel must ensure their own safety, protective measures in place, pay attention to anti-skid, fall prevention, is strictly prohibited command.
6, Foshan steel structure rain proof measures
All kinds of electrical leakage protection device must be sensitive, all kinds of construction line check, insulation outsourcing must be in good condition without damage, prevent leakage of rainwater electric wounding; outdoor setting electric welding machine, grinding machine, threading machine and other equipment should be set up under the upper canopy, take the method of preventing the rain soaked pad. Power line is not erected, bare or plastic wire, distribution box must rain. Metal mechanical and electrical equipment must adopt zero reliable protection, leakage protection device for motor switch box should be reliable. Any mechanical operator must be certified and wear insulated rubber gloves and insulated gloves as required. In case of heavy rain to stop all electrical and mechanical operations, the electric field of steel processing field must turn off the power, after the rain should timely check the organization safety performance of machinery, electrical appliances, rain weather prohibited lifting equipment and components and manual handling of materials or equipment etc.. The cable wires and wires used in the field are strictly forbidden to be soaked in rainwater or laid on wet ground. Overhead installation or underground installation and safe and reliable protection measures should be installed. Before the construction of the rainy season, the power supply, electric box, tower crane grounding, insulation and other projects shall be measured and recorded. After the rain, all electrical equipment and electrical boxes should be checked once. The doors of each electric box must be closed and must not be opened.
Copyright:佛山市勝邦鋼結構有限公司 Foshan Shengbang Steel Structure Co., Ltd. Record Number:粵ICP備13078463號
毛片电影网| 一级毛片看真人在线视频| 欧美国产日韩在线| 国产精品免费久久| 国产伦久视频免费观看 视频| 夜夜操天天爽| 可以在线看黄的网站| 四虎久久影院| 国产网站在线| 国产亚洲免费观看| 超级乱淫伦动漫| 天天做人人爱夜夜爽2020毛片| 韩国三级香港三级日本三级la | 好男人天堂网 久久精品国产这里是免费 国产精品成人一区二区 男人天堂网2021 男人的天堂在线观看 丁香六月综合激情 | 国产不卡精品一区二区三区| 日韩专区第一页| 欧美夜夜骑 青草视频在线观看完整版 久久精品99无色码中文字幕 欧美日韩一区二区在线观看视频 欧美中文字幕在线视频 www.99精品 香蕉视频久久 | 久久国产影院| 欧美激情在线精品video| 亚洲精品久久玖玖玖玖| 欧美国产日韩一区二区三区| 韩国三级视频网站| 一级毛片视频免费| 精品久久久久久综合网| 精品在线观看一区| 九九精品影院| 欧美电影免费| 九九久久99| 欧美国产日韩在线| 一级女性大黄生活片免费| 美国一区二区三区| a级黄色毛片免费播放视频| 国产一区二区精品久久| 国产麻豆精品hdvideoss| 国产麻豆精品视频| 国产不卡高清| 成人免费福利片在线观看| 亚欧成人乱码一区二区| 天堂网中文在线| 日日日夜夜操| 久久99中文字幕久久| 久久成人综合网| 韩国三级视频网站| 高清一级淫片a级中文字幕| 99热精品一区| 青青久久精品| 亚洲 男人 天堂| 九九干| 91麻豆国产| 九九九国产| 亚洲天堂免费观看| 精品国产一级毛片| 欧美日本二区| 99久久精品费精品国产一区二区| 精品毛片视频| 91麻豆国产福利精品| 香蕉视频久久| 欧美a级大片| 欧美日本免费| 美女免费精品视频在线观看| 久草免费在线色站| 亚洲天堂免费观看| 久久99中文字幕| 国产原创中文字幕| 99热精品在线| 精品国产一区二区三区久久久狼| 日本在线不卡视频| 国产一区二区精品尤物| 九九精品久久| 国产网站在线| 亚洲第一色在线| 日本在线不卡视频| 亚洲精品久久玖玖玖玖| 国产91精品露脸国语对白| 四虎影视久久久| 日本免费乱理伦片在线观看2018| 黄视频网站在线免费观看| 天天色成人网| 亚洲 激情| 亚洲精品永久一区| 国产一区精品| 一级女性全黄久久生活片| 午夜久久网| 精品视频免费在线| 毛片电影网| 好男人天堂网 久久精品国产这里是免费 国产精品成人一区二区 男人天堂网2021 男人的天堂在线观看 丁香六月综合激情 | 免费的黄视频| 高清一级做a爱过程不卡视频| 国产伦精品一区二区三区在线观看| 国产网站免费视频| 午夜精品国产自在现线拍| 久久精品免视看国产明星| 国产欧美精品午夜在线播放| a级精品九九九大片免费看| 一级女性全黄久久生活片| 久草免费资源| 国产精品免费精品自在线观看| 麻豆午夜视频| 午夜在线亚洲男人午在线| 可以免费看毛片的网站| 国产成人精品综合久久久| 超级乱淫伦动漫| 韩国毛片基地| 99热精品一区| 国产伦精品一区二区三区无广告| 日本久久久久久久 97久久精品一区二区三区 狠狠色噜噜狠狠狠狠97 日日干综合 五月天婷婷在线观看高清 九色福利视频 | 尤物视频网站在线观看| 欧美电影免费看大全| 日韩字幕在线| 天天做人人爱夜夜爽2020毛片| 欧美激情一区二区三区视频高清 | 午夜欧美成人香蕉剧场| 欧美一级视频免费| 久久精品道一区二区三区| 韩国三级香港三级日本三级la | 免费国产在线观看不卡| 精品视频一区二区| 亚洲精品中文字幕久久久久久| 欧美另类videosbestsex高清 | 国产网站免费观看| 欧美另类videosbestsex久久| 精品国产三级a| 久久精品道一区二区三区| 国产一区二区精品在线观看| 国产不卡在线观看视频| 九九九网站| 欧美18性精品| 成人免费网站视频ww| 国产美女在线观看| 好男人天堂网 久久精品国产这里是免费 国产精品成人一区二区 男人天堂网2021 男人的天堂在线观看 丁香六月综合激情 | 国产伦久视频免费观看视频| 国产网站免费观看| 黄视频网站免费观看| 香蕉视频久久| 欧美国产日韩精品| 国产成a人片在线观看视频| 亚洲精品久久玖玖玖玖| 999久久久免费精品国产牛牛| 高清一级毛片一本到免费观看| 国产精品自拍亚洲| 青青青草视频在线观看| 国产a视频精品免费观看| 精品国产一区二区三区免费 | 欧美1区2区3区| 成人a级高清视频在线观看| 欧美18性精品| 欧美国产日韩精品| 国产国语在线播放视频| 精品国产一区二区三区精东影业| 成人免费高清视频| 黄色短视频网站| 99久久精品费精品国产一区二区| 国产成人精品综合久久久| 欧美激情一区二区三区视频高清 | 欧美另类videosbestsex久久| 午夜家庭影院| 日本在线www| 91麻豆国产福利精品| 精品久久久久久中文字幕一区| 国产a视频| 免费毛片基地| 久久久成人网| 国产成人精品影视| 国产91精品系列在线观看| 日本特黄特黄aaaaa大片| 免费毛片播放| 日韩在线观看视频免费| 成人免费高清视频| 欧美激情一区二区三区视频| 免费毛片播放| 99热精品一区| 日本免费乱理伦片在线观看2018| 欧美大片一区| 欧美电影免费| 天天色成人网| 深夜做爰性大片中文| 999久久狠狠免费精品| 亚欧乱色一区二区三区| 亚欧乱色一区二区三区| 九九久久国产精品| 日本免费乱理伦片在线观看2018| 四虎久久精品国产| 午夜久久网| 亚洲第一页乱| 久久成人性色生活片| 国产91素人搭讪系列天堂| 日韩在线观看视频网站| 在线观看成人网 | 精品国产香蕉伊思人在线又爽又黄| 一级女性大黄生活片免费| 日日夜夜婷婷| 91麻豆精品国产综合久久久| 台湾毛片| 成人免费观看的视频黄页| 午夜激情视频在线观看| 99久久精品国产免费| 91麻豆高清国产在线播放| 精品国产一区二区三区免费 | 深夜做爰性大片中文| 好男人天堂网 久久精品国产这里是免费 国产精品成人一区二区 男人天堂网2021 男人的天堂在线观看 丁香六月综合激情 |